Strategic transition to digital-first procurement: an operational case study of Benedikt Girsch’s engineering workflow

In specialized sectors such as explosion protection and pharmaceuticals, operational efficiency is not merely a goal but a requirement for survival. For firms operating in these high-stakes environments, the transition from legacy 2D-based processes to digital-first procurement is a strategic necessity to maintain a competitive edge. Traditional manufacturing workflows, burdened by manual documentation and fragmented supply chains, can no longer sustain the rapid development cycles required in modern engineering. 

 

This report evaluates how the adoption of meviy transformed the design-to-production lifecycle for Benedikt Girsch’s team. The primary objective is to analyze the operational impact of moving to a 3D-centric model, focusing specifically on Lead Time Reduction and the implementation of Financial Lean Management. By integrating procurement directly into the design phase, the company has transitioned from a reactive sourcing model to a proactive, data-driven operational framework.

Profile Summary

Engineer

Benedikt Girsch

Industry

Pharmaceutical

Explosion Protection

Country

Germany

Use Case

R&D

Prototyping

Service

CNC Machining

Sheet Metal

Nitriding

Since then, we have basically one platform where we can offer a lot of several parts all over Europe or the world. Before that, we had to check all the several home pages of different suppliers to look for the parts we wanted. Now we have it all in one, basically combining Misumi and meviy. We have minimum order quantities sometimes on the other suppliers that we don't have on meviy or Misumi, and that saves us some money. If we need three or four of those parts and the minimum order quantity is maybe 10 or 15, then we have too much, so this is kind of saving some waste.
Benedikt Girsch
Lead Engineer

Operational profile

Customer
Benedikt Girsch, Lead Engineer
Industry
Primary: The Pharmaceutical industry, which demands rigorous compliance with GAMP and FDA regulations.

Secondary: Hydrogen energy, LNG, Oil & Gas, and the Chemical industry.
Location
Core challenge
Administrative burden from manual 2D drawing creation; high risk of annotation and tolerance errors; lack of synchronisation between 3D and 2D data
Why was meviy selected as a manufacturing partner?
Elimination of 2D drawings:
the platform allows for on-demand manufacturing directly from 3D cad data, removing the need for time-consuming 2d documentation.

No minimum order quantity:
meviy allows for the purchase of single pieces, which saves money and reduces waste.

Consolidated platform:
it provides an "all-in-one" platform by combining Misumi and meviy, allowing designers to source standard and custom parts in one place.

Instant quoting:
the platform provides immediate pricing upon uploading 3D models, facilitating faster decision-making.

Capabilities used
Manufacturing methods:
company purchases parts across three main categories: CNC milling & turning, and sheet metal fabrication.

Surface treatments:
company frequently uses nitrading and hard chrome plating for their components.

Global collaboration:
the platform is used by design teams in both Germany and India.

Before meviy: legacy operational constraints

Before adopting a digital-first model, the team faced significant waste within their procurement cycle. Manual documentation and rigid supplier models created strategic bottlenecks that increased the Total Cost of Ownership (TCO) for every part produced. 

Traditional process step
Operational impact
Manual 2D drawings
Designers spent several minutes to one hour per part on documentation, even for complex components.
Manual supplier research
Inefficiency of auditing multiple individual websites to source specific parts.
Quoting cycles
Traditional vendors enforced a one-week wait time for pricing, stalling project momentum.
Push-Based MOQs
Mandatory minimum orders of 10–15 pieces led to excess inventory and inventory depreciation.

These friction points represented more than just lost time; they were a financial liability. Minimum Order Quantities (MOQs) forced a “Push” manufacturing model where capital was tied up in unused components—essentially “dead money” sitting in a warehouse. This accumulation of physical and monetary waste served as the primary catalyst for the team’s shift toward a “Pull” procurement model. 

Decision point: why was meviy selected as the manufacturing partner for this project?

Choosing a digital manufacturing partner requires an alignment between technological capability and procurement flexibility. The decision to integrate meviy into the engineering workflow was based on three core strategic criteria: 

 

  1. Direct 3D integration: the ability to bypass 2D drafting by uploading 3D CAD (STEP) files directly into the manufacturing environment. 
  2. Supply chain synergy: the “All-in-One” benefit of a single channel for both Misumi standard parts and meviy custom parts, simplifying vendor management. 
  3. Just-in-time (JIT) financial model: a move to a “No MOQ” system, allowing the purchase of single pieces to match exact demand, thereby optimizing cash flow. 

After meviy: the workflow in practice

By integrating design and procurement into a single “closed-loop” platform, the company eliminated the hand-off errors common in manual workflows. The new digital process is defined by five key stages: 

 

  1. 3D CAD upload: designers upload STEP files directly, immediately converting design intent into a manufacturable digital asset. 
  2. Instant configuration: technical parameters for CNC milling, turning, or sheet metal are selected, and specialized treatments like nitride hardening are applied with instant pricing feedback. 
  3. The “strict list” digital twin: once a part is configured, meviy generates a unique registered part number. This number acts as a “digital twin” of the part’s configuration and is added to the internal ”strict list” (part list). This eliminates the re-design cycle; once a part is registered, it can be reordered instantly. This “single consolidated channel” ensures that a part designed in India meets the exact specifications when ordered in Germany, eliminating manual documentation errors. 
  4. Lean procurement: the team utilizes a “Pull” system, ordering only the necessary quantities (e.g., 3 or 4 pieces) to satisfy project requirements without creating waste. 
  5. Role-based approval: to maintain operational control, the five designers (Germany and India) handle technical configuration, while Project Managers and Team Leaders are authorized to review the “strict list” and place final orders, ensuring team-wide financial coordination. 

Proof: measurable results

Data-driven validation confirms that the digital transition has significantly improved every key performance indicator within the design-to-production lifecycle. 

Metric
Before meviy
With meviy
Quoting lead time
1 Week
Instantaneous
Documentation cost
Up to 1 Hour / Part
0 Hours (3D-only)
Minimum order quantity
10–15 pieces
1 piece (full flexibility)
Procurement model
push (inventory-heavy)
pull (just-in-time)
Reordering process
manual re-design/audit
instant part number reordering

Voice of the user: insights from Benedikt Girsch:

User adoption is the ultimate metric for any operational change. Benedikt Girsch highlights how the shift from waste to “value-added” tasks has empowered the engineering team: 

The time we need to do complete drawings... takes most of the time. Maybe an hour if it’s complicated... with those loading the steps into your homepage, meanwhile we basically don’t need it.

If we need three or four of those parts and the minimum order quantity is maybe 10 or 15, then we have too much... that’s kind of saving some waste.

Broader business implications

The partnership with meviy has evolved from a tool for designers into a strategic asset that supports four enterprise-wide pillars: 

 

  1. Accelerated speed-to-market: instant pricing and configuration allow the company to bypass the traditional one-week quoting lag, providing a decisive advantage in the fast-paced Pharma and Hydrogen sectors. 
  2. Financial and inventory optimization: the transition to a lean, on-demand capital model ensures that procurement spend is tied strictly to active projects, minimizing “monetary waste.” 
  3. Internal operational innovation: beyond customer products, the team uses the platform to manufacture components for automation machinery for their own factories, accelerating internal digitalization. 
  4. Supply chain consolidation: by using a single portal for both Misumi standard components and meviy custom parts, the company encourages the use of standardized parts, reducing long-term maintenance and sourcing complexity. 

 

This transition serves as a definitive blueprint for high-precision engineering firms. By replacing manual, fragmented procurement with a consolidated digital-first platform, the organization has redefined its standard for operational excellence, ensuring it is prepared for the future of on-demand, digital manufacturing.